WowMetaTracker

WowMetaTracker tracks every WoW meta.

Tracker

Junkyard Machinist

Complete 100 construction projects in Mechagon

A hundred construction projects at one a day, which makes this a hundred days and nothing shorter.

What the achievement asks

Complete a hundred construction projects in Mechagon. Ten points, account-wide, both factions.

Construction projects are the island's daily community effort: everyone on the shard contributes materials towards one project, and when it fills, it completes.

One a day, so a hundred days

The projects reset daily. That is the whole shape of this achievement: there is no way to do two in a day, no catch-up mechanic, and no way to speed it up.

A hundred projects is therefore a hundred days of logging in and contributing. It is the longest single grind in Mechagon and one of the longest in Battle for Azeroth.

Start this on the first day you set foot on the island, before anything else. Every other Mechagon achievement can be finished inside the time this one takes, so any day you skip is a day added to the end.

Contribute, do not complete

You do not have to be the one who finishes a project. Contributing to it counts, so a few materials handed in is the same as carrying the whole thing.

That makes the daily cost about a minute once you are on the island, which is why the sensible habit is to hand something in the moment you arrive rather than leaving it until you are done with everything else.

What else the same trip gives you

The island rewards being visited daily anyway. While you are here:

None of those finishes faster than a hundred days either, so treat the whole island as one daily habit rather than four separate errands.